Outerprise Waste Metric (OWM)

Vince Jones, CEO Entercation · Source draft

How is the Outerprise Waste Metric calculated?

For each route, K = C + (T × V). OWM = K_E − K_O. The comparison multiple is K_E / K_O only when K_O > 0. C is cost in cents, T is whole calendar days and V is declared cents per day; an undeclared V is zero. OWM compares modeled totals, not automatically realized cash savings.

Which inputs and rounding rules apply?

The existing OWM implementation uses exact integer math. Input costs, calendar days and daily value must be nonnegative whole numbers. It retains negative OWM: if the Outerprise total exceeds the enterprise total, the difference is negative.

The multiple is displayed with half-up rounding to two decimals. When K_O = 0, the multiple is unavailable, not infinity. Currency is displayed from integer cents. Record the input provenance and distinguish dollars paid from a modeled value assigned to time.

What does the hypothetical staff-hour example show?

Hypothetical only: 120 staff hours versus 35 staff hours at $75 per hour gives (120 − 35) × $75 = $6,375 per evaluation. Across 100 identical hypothetical evaluations, $6,375 × 100 = $637,500. The two modeled staff-cost totals are $9,000 and $2,625.

These are staff-time valuations, not observed cash savings or recorded OWM costs. Staff hours are not calendar days and must not be inserted into T. Do not count the same labor expense again inside both C and a daily-value assumption.

How should a separate calendar-day scenario be handled?

A separate hypothetical 90-day versus 30-day comparison has a 60-calendar-day difference. Its modeled time component is 60 × V cents, using a declared daily value. With no declared V, that component is zero. No daily value or cash saving is inferred from the $75 hourly example.

A realized claim needs comparable actual costs, dates, accepted-deliverable criteria and a declared value basis. The equation alone cannot establish causation, institutional savings or CRA credit.

OWM quantities and boundaries
QuantityUnit / ruleMeaning
CInteger centsRoute cost with documented basis
TWhole calendar daysNot staff hours
VDeclared integer cents per day; default 0Modeled daily value, not automatic cash
KC + T × VCost-plus-time modeled total
OWMK_E − K_ONegative results retained
MultipleK_E / K_O, only K_O > 0Half-up display to two decimals

Sources & contextual records

Source reconciliation uses retained application code and the public examination book. Author-reported events are not independently audited. Historical definitions and agreement records remain separate and unchanged.